Aerial view of long rows of solar panel tables laid out across red soil at the Pavagada site

Pavagada Phase 1

A 6.5 MW solar power project under development in Pavagada, Karnataka.

Project capacity 6.5 MWp DC / 5 MW AC
Location Pavagada, Karnataka
Sector Solar power
Status Under development
Asset life 30 years
Connectivity KPTCL · established
Consumer segment Industries, hospitals, commercial
Structure Group Captive

Project overview

Pavagada Phase 1 is a 6.5 MW solar power project under development in Pavagada, Karnataka. It is the first asset in Celestio's pipeline.

Pavagada has emerged as one of India's premier solar energy destinations due to its strong solar irradiation, infrastructure readiness, and renewable energy ecosystem.

The project is being developed with a focus on operational efficiency, sustainability, and long-term value creation for stakeholders and power consumers.

Once running, this project is expected to avoid roughly 9,800 tonnes of CO₂ a year, the equivalent of powering about 10,000 Indian households. See sustainability for the method and the portfolio total.

One of India's most proven solar regions.

Pavagada is one of India's leading solar generation regions, known for its strong solar potential and well-established power evacuation infrastructure.

The site benefits from robust KPTCL connectivity and a mature, reliable grid environment.

The dry, open terrain and low hills characteristic of the Pavagada region
Close view along a row of installed solar modules under an overcast sky

Reliable green power for the consumers who need it.

The project is designed to serve industries, hospitals, manufacturing units, and commercial establishments seeking reliable, cost-effective green power, operating under the Karnataka Group Captive framework.

Site survey, Pavagada region Indicative only, not to scale
77.10°E 77.50°E 14.30°N 13.90°N TUMKUR · DISTRICT ANDHRA · PRADESH PHASE 1 · 6.5 MWp 14.10°N · 77.27°E PHASE 2 · 3.5 MWp adjacent site N 0 10 KM SITE SURVEY · v.01 · KARNATAKA

Interested in qualifying consumption from Pavagada Phase 1?

Call Get in touch